Hardik 3ec3a2b4ef feat(crewing): Phase 3b — recruitment pipeline (flagged)
Second slice of Phase 3 (stacked on 3a candidates). The gated 7-stage
recruitment pipeline per Crewing-Implementation-Spec §5.1/§8.4–8.5/§8.13.
Behind NEXT_PUBLIC_CREWING_ENABLED; production unchanged.

What's in
- Schema (crewing_pipeline migration): Application (one per requisition+candidate)
  + 7-stage ApplicationStage; ApplicationGate (SALARY/SELECTION/WAIVER pending =
  Manager queue items); ReferenceCheck; effective-dated SalaryStructure (attached
  to the Application now, bound to the assignment in 3c); minimal BankDetail/EpfDetail
  captured at DOC_VERIFICATION (PII encryption deferred to Phase 4). CrewAction +=
  applicationId; pipeline CrewActionTypes.
- State machine: lib/application-pipeline.ts — sourcing advances MPO/Manager;
  approve_salary + select are Manager-only; orthogonal canReject; BOARD_STAGES.
- Actions: addApplication (first candidate → requisition SHORTLISTING), advanceStage,
  recordReferenceCheck, verifyDocuments (bank/EPF), agreeSalary→approveSalary/returnSalary,
  recordInterviewResult, requestInterviewWaiver→approve/decline, selectCandidate
  (→ requisition SELECTED)/returnSelection, rejectApplication. Waiver never automatic (R2).
  Notifications SALARY/SELECTION/WAIVER + CANDIDATE_PROPOSED.
- Screens: pipeline board per requisition (7 columns + Add candidate); application
  workhorse (7-step stepper + adaptive per-stage action card); "Open pipeline" on the
  requisition detail. Central /approvals gains a crewing section (inline Approve/Return)
  for one unified Manager queue (§8.13 R8).

Tests & docs
- Unit: application-pipeline.test.ts (9). Integration: applications.test.ts (10) —
  full happy path, salary/selection/waiver approvals + Manager-only gating, failed
  interview, reject, site-staff lockout. type-check clean; full unit (234) + integration
  (163) green.
- CLAUDE.md "Crewing" updated with the Phase 3b surface.

Deferred: onboarding (Epic D, Phase 3c) — SELECTED → ONBOARDED, CrewAssignment,
employeeId, requisition → FILLED, salary bound to the assignment.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-22 18:49:12 +05:30
..
validations feat(po): allow submitter to set an optional PO date 2026-06-16 13:06:12 +05:30
application-pipeline.ts feat(crewing): Phase 3b — recruitment pipeline (flagged) 2026-06-22 18:49:12 +05:30
attachments.ts fix(po): show all attachments grouped by type on PO details 2026-06-19 04:43:44 +05:30
cancelled-watermark.ts fix(po): size XLSX export images by pixels (aspect preserved) 2026-06-21 13:27:15 +05:30
cart.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
cost-centre-groups.ts refactor: revert cost centre to vessels only, remove vessel-site link 2026-05-30 18:14:24 +05:30
db.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
feature-flags.ts feat(crewing): foundations — SITE_STAFF role, ranks reference data + admin (flagged) 2026-06-22 13:26:04 +05:30
forgejo.ts feat(automation): issue-to-deploy pipeline — Report Issue button, Claude watcher, tag-triggered deploy 2026-06-11 16:39:43 +05:30
geo.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
id-generators.ts feat(crewing): foundations — SITE_STAFF role, ranks reference data + admin (flagged) 2026-06-22 13:26:04 +05:30
image-size.ts fix(po): size XLSX export images by pixels (aspect preserved) 2026-06-21 13:27:15 +05:30
notifier.ts feat(crewing): Phase 3b — recruitment pipeline (flagged) 2026-06-22 18:49:12 +05:30
permissions.ts feat(crewing): foundations — SITE_STAFF role, ranks reference data + admin (flagged) 2026-06-22 13:26:04 +05:30
po-export-layout.ts fix(po): keep the export stamp clear of the signature (no overlap) 2026-06-21 15:35:09 +05:30
po-import-parser.ts feat: structured PO numbers, import closed, auto-vendor/product, company code, inventory flag 2026-05-31 01:56:33 +05:30
po-number.ts fix(po-number): floor at 9000, imported POs keep original PO number 2026-05-31 02:33:42 +05:30
po-state-machine.ts feat(po): cancel POs (manager/superuser) + optional supersede link (#53) 2026-06-21 12:20:54 +05:30
requisition-number.ts feat(crewing): Phase 2 — requisitions + relief requests (flagged) 2026-06-22 18:22:59 +05:30
requisition-service.ts feat(crewing): Phase 3b — recruitment pipeline (flagged) 2026-06-22 18:49:12 +05:30
requisition-state-machine.ts feat(crewing): Phase 2 — requisitions + relief requests (flagged) 2026-06-22 18:22:59 +05:30
storage.ts feat(crewing): Phase 3a — candidates / talent pool (flagged) 2026-06-22 18:23:01 +05:30
upload-files.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
utils.ts feat(po): cancel POs (manager/superuser) + optional supersede link (#53) 2026-06-21 12:20:54 +05:30