pelagia-portal/App/lib
Hardik df3b4bdc97 feat(crewing): resolve self-contained deferred follow-ups (flagged)
Clears the self-contained deferrals tracked across phases. Stacks on 5b appraisal.
Behind NEXT_PUBLIC_CREWING_ENABLED.

- SITE_STAFF login on onboard/placement (Epic D follow-up): lib/crew-login.ts
  maybeCreateSiteStaffLogin creates a passwordless SITE_STAFF User (sharing the
  CRW- employee no., siteId = the assignment's site) when a grantsLogin rank is
  onboarded (onboardCandidate) or placed (placeCrew) and the crew member has an
  email. No-op otherwise.
- Own-site scoping (Epic E follow-up, §8.7): User.siteId added (migration
  crewing_followups); the Crew directory filters a SITE_STAFF user with a home site
  to crew whose active assignment is at that site (graceful when unset). The link is
  set at login creation.
- PPE / next-of-kin verify gates (Epic F/I follow-up): PpeIssue/NextOfKin gained
  verificationStatus + verifiedById; verifyPpe / verifyNextOfKin (verify_site_records,
  MPO) + queue sections in /crewing/verification.

Tests & docs
- Integration: crewing-followups.test.ts (6) — login created/skipped by rank+email
  (+ siteId set), PPE/NoK verify + reject-reason + already-decided guard + gating.
  type-check clean; full unit (245) + integration (211) green (RESEND_API_KEY unset).
- CLAUDE.md updated.

Part of Epic D (#78), Epic E (#79), Epic F (#80), Epic I (#83).
Still deferred (not self-contained): public careers API (A2); Pay-status pay rows (Phase 6).

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-22 22:28:23 +05:30
..
validations feat(po): allow submitter to set an optional PO date 2026-06-16 13:06:12 +05:30
application-pipeline.ts feat(crewing): Phase 3b — recruitment pipeline (flagged) 2026-06-22 18:49:12 +05:30
appraisal-state-machine.ts feat(crewing): Phase 5b — appraisal (flagged) 2026-06-22 22:09:32 +05:30
attachments.ts fix(po): show all attachments grouped by type on PO details 2026-06-19 04:43:44 +05:30
cancelled-watermark.ts fix(po): size XLSX export images by pixels (aspect preserved) 2026-06-21 13:27:15 +05:30
cart.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
cost-centre-groups.ts refactor: revert cost centre to vessels only, remove vessel-site link 2026-05-30 18:14:24 +05:30
crew-login.ts feat(crewing): resolve self-contained deferred follow-ups (flagged) 2026-06-22 22:28:23 +05:30
crew-pii.ts feat(crewing): Phase 4a — crew records & profile + PPE (flagged) 2026-06-22 19:27:21 +05:30
db.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
employee-number.ts feat(crewing): Phase 3c — onboarding (flagged) 2026-06-22 19:12:53 +05:30
feature-flags.ts feat(crewing): foundations — SITE_STAFF role, ranks reference data + admin (flagged) 2026-06-22 13:26:04 +05:30
forgejo.ts feat(automation): issue-to-deploy pipeline — Report Issue button, Claude watcher, tag-triggered deploy 2026-06-11 16:39:43 +05:30
geo.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
id-generators.ts feat(crewing): foundations — SITE_STAFF role, ranks reference data + admin (flagged) 2026-06-22 13:26:04 +05:30
image-size.ts fix(po): size XLSX export images by pixels (aspect preserved) 2026-06-21 13:27:15 +05:30
leave-clash.ts feat(crewing): clash detection by required strength (Option A) 2026-06-22 21:14:21 +05:30
notifier.ts feat(crewing): Phase 5b — appraisal (flagged) 2026-06-22 22:09:32 +05:30
permissions.ts feat(crewing): admin crew management — direct placement, CRUD, strength config 2026-06-22 21:23:31 +05:30
po-export-layout.ts fix(po): keep the export stamp clear of the signature (no overlap) 2026-06-21 15:35:09 +05:30
po-import-parser.ts feat: structured PO numbers, import closed, auto-vendor/product, company code, inventory flag 2026-05-31 01:56:33 +05:30
po-number.ts fix(po-number): floor at 9000, imported POs keep original PO number 2026-05-31 02:33:42 +05:30
po-state-machine.ts feat(po): cancel POs (manager/superuser) + optional supersede link (#53) 2026-06-21 12:20:54 +05:30
requisition-number.ts feat(crewing): Phase 2 — requisitions + relief requests (flagged) 2026-06-22 18:22:59 +05:30
requisition-service.ts feat(crewing): Phase 3b — recruitment pipeline (flagged) 2026-06-22 18:49:12 +05:30
requisition-state-machine.ts feat(crewing): Phase 2 — requisitions + relief requests (flagged) 2026-06-22 18:22:59 +05:30
storage.ts feat(crewing): Phase 3a — candidates / talent pool (flagged) 2026-06-22 18:23:01 +05:30
upload-files.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
utils.ts feat(po): cancel POs (manager/superuser) + optional supersede link (#53) 2026-06-21 12:20:54 +05:30