..
validations
feat(po): allow submitter to set an optional PO date
2026-06-16 13:06:12 +05:30
application-pipeline.ts
feat(crewing): Phase 3b — recruitment pipeline (flagged)
2026-06-22 18:49:12 +05:30
attachments.ts
fix(po): show all attachments grouped by type on PO details
2026-06-19 04:43:44 +05:30
cancelled-watermark.ts
fix(po): size XLSX export images by pixels (aspect preserved)
2026-06-21 13:27:15 +05:30
cart.ts
chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design
2026-05-18 23:18:58 +05:30
cost-centre-groups.ts
refactor: revert cost centre to vessels only, remove vessel-site link
2026-05-30 18:14:24 +05:30
crew-pii.ts
feat(crewing): Phase 4a — crew records & profile + PPE (flagged)
2026-06-22 19:27:21 +05:30
db.ts
chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design
2026-05-18 23:18:58 +05:30
employee-number.ts
feat(crewing): Phase 3c — onboarding (flagged)
2026-06-22 19:12:53 +05:30
feature-flags.ts
feat(crewing): foundations — SITE_STAFF role, ranks reference data + admin (flagged)
2026-06-22 13:26:04 +05:30
forgejo.ts
feat(automation): issue-to-deploy pipeline — Report Issue button, Claude watcher, tag-triggered deploy
2026-06-11 16:39:43 +05:30
geo.ts
chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design
2026-05-18 23:18:58 +05:30
id-generators.ts
feat(crewing): foundations — SITE_STAFF role, ranks reference data + admin (flagged)
2026-06-22 13:26:04 +05:30
image-size.ts
fix(po): size XLSX export images by pixels (aspect preserved)
2026-06-21 13:27:15 +05:30
leave-clash.ts
feat(crewing): clash detection by required strength (Option A)
2026-06-22 21:14:21 +05:30
notifier.ts
fix(notifier): don't construct Resend without an API key (CI crash)
2026-06-22 21:41:36 +05:30
permissions.ts
feat(crewing): admin crew management — direct placement, CRUD, strength config
2026-06-22 21:23:31 +05:30
po-export-layout.ts
fix(po): keep the export stamp clear of the signature (no overlap)
2026-06-21 15:35:09 +05:30
po-import-parser.ts
feat: structured PO numbers, import closed, auto-vendor/product, company code, inventory flag
2026-05-31 01:56:33 +05:30
po-number.ts
fix(po-number): floor at 9000, imported POs keep original PO number
2026-05-31 02:33:42 +05:30
po-state-machine.ts
feat(po): cancel POs (manager/superuser) + optional supersede link ( #53 )
2026-06-21 12:20:54 +05:30
requisition-number.ts
feat(crewing): Phase 2 — requisitions + relief requests (flagged)
2026-06-22 18:22:59 +05:30
requisition-service.ts
feat(crewing): Phase 3b — recruitment pipeline (flagged)
2026-06-22 18:49:12 +05:30
requisition-state-machine.ts
feat(crewing): Phase 2 — requisitions + relief requests (flagged)
2026-06-22 18:22:59 +05:30
storage.ts
feat(crewing): Phase 3a — candidates / talent pool (flagged)
2026-06-22 18:23:01 +05:30
upload-files.ts
chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design
2026-05-18 23:18:58 +05:30
utils.ts
feat(po): cancel POs (manager/superuser) + optional supersede link ( #53 )
2026-06-21 12:20:54 +05:30