pelagia-portal/App/lib
Hardik c82efa71af feat(crewing): Phase 3c — onboarding (flagged)
Final slice of Phase 3 (stacked on 3b pipeline). The onboarding transaction that
turns a SELECTED candidate into active crew, per Crewing-Implementation-Spec
§8.5/§9/§11. Behind NEXT_PUBLIC_CREWING_ENABLED; production unchanged.

What's in
- Schema (crewing_onboarding migration): CrewAssignment + AssignmentStatus
  (ACTIVE/ON_LEAVE/SIGNED_OFF — leave/sign-off are Phase 4); ContractLetter
  (salaryRestricted); SalaryStructure += assignmentId; CrewActionType +=
  CREW_ONBOARDED. Employee numbers CRW-xxxx via lib/employee-number.ts.
- Action (onboardCandidate, onboard_crew): one transaction off a SELECTED
  application — assign employeeId, create CrewAssignment(ACTIVE, signOnDate),
  bind the approved SalaryStructure (assignmentId + effectiveFrom), Application →
  ONBOARDED, Requisition → FILLED, CrewMember → EMPLOYEE (+ currentRank); contract
  letter stored after. Guards flag + permission + SELECTED state.
- Screen: the SELECTED action card's "Onboard to crew" modal (joining date,
  contract upload, starts-automatically chips); the CRW- number shows on the
  ONBOARDED card.

Tests & docs
- Integration: onboarding.test.ts (5) — full transaction, requisition FILLED +
  salary binding, joining-date + SELECTED-only guards, permission gating, sequential
  CRW- ids. type-check clean; full unit (234) + integration (168) green.
- CLAUDE.md updated with the Phase 3c surface.

Deferred: SITE_STAFF login creation for management ranks (grantsLogin) — a
follow-up; attendance/experience/PPE records begin in Phase 4.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-22 19:12:53 +05:30
..
validations feat(po): allow submitter to set an optional PO date 2026-06-16 13:06:12 +05:30
application-pipeline.ts feat(crewing): Phase 3b — recruitment pipeline (flagged) 2026-06-22 18:49:12 +05:30
attachments.ts fix(po): show all attachments grouped by type on PO details 2026-06-19 04:43:44 +05:30
cancelled-watermark.ts fix(po): size XLSX export images by pixels (aspect preserved) 2026-06-21 13:27:15 +05:30
cart.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
cost-centre-groups.ts refactor: revert cost centre to vessels only, remove vessel-site link 2026-05-30 18:14:24 +05:30
db.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
employee-number.ts feat(crewing): Phase 3c — onboarding (flagged) 2026-06-22 19:12:53 +05:30
feature-flags.ts feat(crewing): foundations — SITE_STAFF role, ranks reference data + admin (flagged) 2026-06-22 13:26:04 +05:30
forgejo.ts feat(automation): issue-to-deploy pipeline — Report Issue button, Claude watcher, tag-triggered deploy 2026-06-11 16:39:43 +05:30
geo.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
id-generators.ts feat(crewing): foundations — SITE_STAFF role, ranks reference data + admin (flagged) 2026-06-22 13:26:04 +05:30
image-size.ts fix(po): size XLSX export images by pixels (aspect preserved) 2026-06-21 13:27:15 +05:30
notifier.ts feat(crewing): Phase 3b — recruitment pipeline (flagged) 2026-06-22 18:49:12 +05:30
permissions.ts feat(crewing): foundations — SITE_STAFF role, ranks reference data + admin (flagged) 2026-06-22 13:26:04 +05:30
po-export-layout.ts fix(po): keep the export stamp clear of the signature (no overlap) 2026-06-21 15:35:09 +05:30
po-import-parser.ts feat: structured PO numbers, import closed, auto-vendor/product, company code, inventory flag 2026-05-31 01:56:33 +05:30
po-number.ts fix(po-number): floor at 9000, imported POs keep original PO number 2026-05-31 02:33:42 +05:30
po-state-machine.ts feat(po): cancel POs (manager/superuser) + optional supersede link (#53) 2026-06-21 12:20:54 +05:30
requisition-number.ts feat(crewing): Phase 2 — requisitions + relief requests (flagged) 2026-06-22 18:22:59 +05:30
requisition-service.ts feat(crewing): Phase 3b — recruitment pipeline (flagged) 2026-06-22 18:49:12 +05:30
requisition-state-machine.ts feat(crewing): Phase 2 — requisitions + relief requests (flagged) 2026-06-22 18:22:59 +05:30
storage.ts feat(crewing): Phase 3a — candidates / talent pool (flagged) 2026-06-22 18:23:01 +05:30
upload-files.ts chore: restructure repo — flatten App/pelagia-portal to App, rename Prototype→Wireframe and Spec→Design 2026-05-18 23:18:58 +05:30
utils.ts feat(po): cancel POs (manager/superuser) + optional supersede link (#53) 2026-06-21 12:20:54 +05:30